ALS & changing mobility: home adaptation planning
Plan essential routes, equipment and support with your ALS/MND care team.

Use this guide to prepare questions for an individual assessment. Needs, progression, equipment and local requirements vary; this is not a clinical prescription or a construction specification.
Start with priorities, rather than a fixed timetable
Discuss home access with the ALS/MND team early. There is no universal month-by-month renovation schedule. Ask an occupational therapist to assess current tasks and likely equipment needs before commissioning permanent work.
Record essential routes and temporary options
Map the entrance, sleeping area and bathroom. Ask whether a different entrance or ground-floor room could reduce disruption. Record obstacles and consider removable changes with the assessor while longer-term work is planned.
Plan around the actual equipment and assistance
Measure the proposed wheelchair, accessories, turning movements and helper positions. A nominal door size does not guarantee a clear opening. Shower layouts, bed access and lifting equipment need an individual design and a structural review where relevant.
Ask who will assess transfers, select any hoist and sling, train helpers, and confirm staffing and emergency arrangements. A ceiling hoist does not automatically make a transfer safe for one helper.
Check controls, funding and continuity
Review how the person will operate lighting, communication and help systems as needs change. Test access methods with the care team and equipment supplier; voice control may not remain usable. Plan support during outages and repairs.
Ask local services about assessment, equipment loans and financial support. Eligibility and availability differ; obtain written approval before assuming a renovation will be funded.
Plan ahead and agree review points
Use the general home adaptation timeline to organise current needs, next-stage questions and reasons to review sooner. Related planning guide added 30 October 2026.
Ask the care team which changes may take time to assess, fund, deliver or install. Keep a current plan and a next-stage plan, with a named contact and review date. Revisit the plan after a change in everyday tasks, equipment or available assistance; progression is individual.
- Now: record essential routes, current difficulties and an agreed temporary arrangement.
- Before ordering: trial controls and equipment where possible; ask about loans, rental, servicing, returns and who provides training.
- At each review: check access, communication, backup arrangements and whether the resident’s priorities have changed.
Plan the return-home discussion · Record controls and backup access · Find local assessment and support routes.
Equipment loans and communication support
Ask the ALS/MND team and speech and language therapist about communication access before buying privately. Assessment, trials and delivery can take time; voice control is not the only access method. Ask about alternatives and backup communication.
In the UK, MND Association equipment support explains available loan/funding routes and service changes. Its services directory includes communication support. Availability and regional coverage must be confirmed with the service. These links are starting points, not a promise of eligibility or stock. Checked 16 October 2026.
Sources and further reading
Sources reviewed 7 October 2026. No hands-on testing or professional assessment is claimed.
Turn this guide into a plan
Choose the next step that fits your project. These tools help prepare a discussion; they do not replace an individual assessment.
Frequently asked questions
Should ALS home adaptations follow a fixed timetable?
No. Discuss planning early with the care team, but base the sequence on individual priorities, assessments and changing needs.